The shutdown has a fixed end
Dismantling, adaptation and assembly must be completed within a binding time window.

Piping construction for industrial plants
We provide pipefitters, fabricators, welders and suitable industrial fitters for assembly, modifications and maintenance.
Check availabilityNon-binding request. Response within 30 minutes.
Step 1 of 2
Typical project situations
Piping work is closely linked to assembly, testing and plant start-up. Delays quickly affect other trades.
Dismantling, adaptation and assembly must be completed within a binding time window.
Additional piping, connections or plant areas increase staffing needs at short notice.
Materials, isometrics, welding procedures or safety rules require carefully selected profiles.
Services
We clarify technical documents, materials, connections, safety requirements and site conditions in advance.
Check availability
Installation of industrial piping systems according to isometric drawings, technical drawings and project requirements.

Preparation and adjustment of pipes and components to suit the material and installation conditions.

Welding on industrial piping systems according to defined procedures, materials and project requirements.

Modification and extension of existing piping systems during ongoing projects or plant modifications.

Dismantling, adjustment and reassembly of piping and plant components.

Support during overhauls, planned plant shutdowns, repairs and maintenance work.
Process
We take care of selection, coordination, travel, accommodation and deployment planning. You get the right specialists and a dedicated point of contact throughout your project.
Check availabilityYour requirements, timeframe and project location in under two minutes.
Suitable profiles with qualifications and availability.
We organise travel, accommodation and deployment planning.
One central point of contact throughout the entire assignment.
Reference projects
The existing project report illustrates a comparable service area involving piping and maintenance work within a fixed window.

Chemical Industry
During a planned plant shutdown, we supported the project with additional specialists for maintenance and piping work. The objective was to use maintenance windows efficiently and minimise restart times.
View projectYour next step
Tell us the system, materials, documents, tasks, dates and location. We will check suitable profiles and team sizes.
Non-binding request. Response within 30 minutes.
FAQ
Profiles depend on materials, connections, isometrics and tasks. Typical specialists include: