Agrivoltaic installation with moving solar trackers in St. Andrä, Austria

Assembly and quality control of an agrivoltaic installation in Austria

SchaefflerKUKAGROBSiemensDurrBoschHitachiDeutsche BahnBBS AutomationOptima

Project overview

Assembly support and surveying of solar trackers

During the construction of a large-scale agrivoltaic installation in St. Andrä, Austria, amd Industriemonteure was on site for almost twelve months. Our team carried out the mechanical assembly and surveying of the moving solar trackers, as well as technical quality control.

The number of specialists on site varied depending on the construction phase. At peak times, the team consisted of up to ten people. The final quality checks of the installation are currently under way.

Mechanical structure and tracking systems beneath the solar panels

Initial situation and requirements

  • Construction of a large-scale agrivoltaic installation with moving solar trackers.
  • High standards for the precise alignment of the installation structures.
  • Ensuring the mechanical functionality of the tracking systems.
  • A need for additional qualified specialists across several project phases.

Our approach to the project

  • Support with the mechanical assembly of the installation structures and solar trackers.
  • Assistance with surveying and checking correct alignment.
  • Technical quality control of the moving tracking systems and their operation.
  • Flexible provision of up to ten specialists over a period of almost twelve months.
  • Support during the final quality control phase.
Team member surveying the installation structure using a surveying instrument

Results and added value

During the construction of the agrivoltaic installation in St. Andrä, amd Industriemonteure was on site for almost twelve months. Depending on the construction phase, up to ten team members were deployed. Their tasks included mechanical assembly, surveying of the moving solar trackers and inspection of the work carried out.

Assembly has now been completed. The final quality checks are still being carried out. amd Industriemonteure remains involved in the project during this phase as well.

Overview of the agrivoltaic installation in St. Andrä with solar trackers and wind turbines in the background

Request project support for your plant

If you need qualified specialists for assembly, electrical work, commissioning or technical project support, we will plan the deployment together with you.

Request a project